Pool Contruction Sequence 5

Rock Work

Placeholder Picture

Rock work for waterfalls, retaining walls, and accent or natural boulders around your pool will be installed at this time. The water works will be tested for operation and proper plumbing installation.

Deck

Placeholder Picture

The finishing materials, of your choice are applied to the deck area. Decking that surrounds your pool can be concrete, pea gravel, brick, stone, cool deck, tile or many other materials. Concrete decking around the pool is 4” minimum thickness with wire mesh reinforcement throughout. Any deck shape changes, additional deck or deletions should be made at the time prior to forming. Some changes may have additional costs and no changes to the deck will be made after the deck has been poured and/or installed.

Clean Up

Placeholder Picture

Construction debris will be cleaned away from both the interior and the exterior of the swimming pool at this time. If the exterior fence was taken down, it will be put back up in that municipalities require pool safety barriers to deter children from entering the pool.

previous
next

"Building our reputation one pool at a time"

Placeholder Picture