FAQs #11

How long will my pool take to build? - What should I know about the pool layout? - I’ve heard about dust, noise, and destruction that can happen during the dig, is this true? - How do I know that my plumbing is done correctly and will not leak? - When is my equipment plumbed in place? - What does the steel reinforcing do for my pool? - What protects my pool from electrical problems? - When will my pool start looking like a pool? - What has to happen before my deck is installed? - What are my responsibilities concerning the deck? - When do I get rid of this construction mess? - How do they get the plaster or other interior finish into my pool? - When do I learn how to use the pool?

Cleanup

Placeholder Picture

When do I get rid of this construction mess?
The unavoidable construction mess begins at Gunite as the concrete truck gets cleaned out. This continues and builds through the deck process. All of this gets cleaned up just prior to the pool being finished). Trenches are all filled, light grading is done, and the yard is raked. Basically we make everything neat and presentable. Landscaping is not provided unless it was part of your pool contract.

previous
next

"Building our reputation one pool at a time"

Placeholder Picture