How do I know that my plumbing is done correctly and will not leak?
In addition to using schedule 40 PVC (very thick pipe) we keep all plumbing under pressure throughout the construction process. We routinely check these pressure readings to insure that the plumbing is secure. Our plumbers follow a detailed plan for the location of every feature, pool return, and drain. You will notice that pipes are protruding out from the pool dig. These will be cut off near the end of construction and will finish flush to the final pool wall.