Pool Contruction Sequence 3

Stub-Out

Placeholder Picture

Plumbing and electrical stub-out is performed. 'Stub-out' means that the major components of the plumbing/electrical parts are installed inside the wall and through the ReBar (they will be finished at a later date). Non-corrosive schedule 40 PVC plumbing pipes, with schedule 40 fittings, will be used throughout your pool. Our plumber will place the pipes and set in place the latest state of the art equipment per your plan. Electric wiring will be installed from your electric panel to the equipment. Then, the installation extends from the equipment to all the lighting fixtures and equipment in your pool. Your protection and safety is our number one quality measure and all electric wiring, conduit, and grounding devices meet and/or exceed National Electric Code standards. The latest state of the art ground fault interrupter devices will be installed for protection against electrical fault.

Gunite

Placeholder Picture

Gunite is pneumatically applied which is a spraying process to create the pool shell. The pool shell implies the base flooring, wall areas, and bond beam of your pool. By strict specifications, gunite is applied to both sides of the ReBar to suspend the bars within the walls and floor to form a solid structure. Water curing of the gunite is critical and the entire pool shell must be hosed or sprayed with water three times daily, for seven to ten days. This slows the gunite's curing process, and is a preventative measure that will minimize shrinkage cracks due to premature curing.

previous
next

"Building our reputation one pool at a time"

Placeholder Picture