FAQs #9

How long will my pool take to build? - What should I know about the pool layout? - I’ve heard about dust, noise, and destruction that can happen during the dig, is this true? - How do I know that my plumbing is done correctly and will not leak? - When is my equipment plumbed in place? - What does the steel reinforcing do for my pool? - What protects my pool from electrical problems? - When will my pool start looking like a pool? What has to happen before my deck is installed? - What are my responsibilities concerning the deck? - When do I get rid of this construction mess? - How do they get the plaster or other interior finish into my pool? - When do I learn how to use the pool?

Deck Installation

Placeholder Picture

What has to happen before my deck is installed?
We must have all rockwork, boulders and waterfalls done completed prior to deck. This is also a good time to install any masonry such as barbecues, some aspects of your outdoor kitchen, fire pits benches, and equipment walls. Any gas lines, landscape sprinkler and drip lines, landscape lighting lines etc. that are to be under the deck, should be in before we form your deck. This is also a good time to review and make sure that your deck that you have planned is on the plan the way you want it. Extra costs may result if you have us form the deck one way and then decide to change it after forming.

previous
next

"Building our reputation one pool at a time"

Placeholder Picture